MIL-PRF-83383E
c. Verification, every 36 months, that the group C periodic inspections have been performed as applicable (see
4.5.2.2). The inspections shall consist of the examinations and tests specified in table VI, in the order
shown. If test results indicate nonconformance with specification requirements, and corrective action
acceptable to the qualifying activity has not been taken, action may be taken to remove the failing product
from the QPL.
In the event that no production has occurred in this period, the contractor shall still verify to the qualifying activity that
the capacity to manufacture and test QPL RCCB's still exists and that the contractor wants to
remain on the QPL.
4.5 Conformance inspection.
4.5.1 Inspection of product for delivery. Inspection of product for delivery shall consist of group A inspection.
4.5.1.1 Inspection lot. An inspection lot shall consist of all the RCCB's covered by a single specification sheet
produced under essentially the same conditions within a period not to exceed 1 month, and offered for inspection at
one time.
4.5.1.1.1 Group A inspection. Group A inspection shall consist of the inspections specified in table III.
4.5.1.1.1.1. Sampling plan. Group A inspection shall be on an inspection lot basis. Samples shall be selected in
accordance with table lV, based on the inspection lot. If there are one or more failures, the inspection lot shall be
considered to have failed.
4.5.1.1.2 Rejected lots. If an inspection lot is rejected, the supplier may rework the lot to correct the defects or 100
percent inspect the lot and remove all defective parts. Reworked lots shall be resubmitted for inspection. Such lots
shall be separated from new lots and shall be clearly identified as reinspected lots. If one or more defects are found
in this second sample, the lot shall be rejected and shall not be supplied to this specification.
4.5.1.1.3 Disposition of sample units. Sample units which have passed all the group A inspection may be delivered
on the contract or order if the lot is accepted and the sample units are still within specified electrical tolerances.
4.5.2 Periodic inspection. Periodic inspection shall consist of groups B and C. Except where the results of these
inspections show noncompliance with the applicable requirements (see 4.5.2.2.3), delivery of products which have
passed group A shall not be delayed pending the results of these periodic inspections.
4.5.2.1 Group B inspection. Group B inspection shall consist of the inspections specified in table V, in
the order shown. Group B inspection shall be made on sample units selected from inspection lots which
have passed group A inspection.
9