MIL-PRF-83383E
TABLE I. Tripping times for calibration tests.
Ambient temperature °C
Calibration tests
Percent rated current
Tripping time
±5°C
Minimum ultimate trip 1/ 2/
115
+25
No trip 3/
Maximum ultimate trip 1/
138
1 hour max
200
Overload and trip-free
400
At -54, +25, and
(see 3.1)
1000
+71
Ambient effect on
115
-54
No trip 3/
calibration (ultimate trip
160
1 hour max
limits)
100
+71
No trip 3/
138
1 hour max
200
Within maximum and
Unbalanced overload 4/
400
+25
10% of minimum trip
1000
time limits (see 3.1)
1/
Temperature rise of the terminals shall not exceed 75°C during testing.
2/
3/
Test time shall be 1 hour, minimum.
4/
Triple pole RCCB's only.
3.7 Calibration. When tested as specified in 4.6.4.1 (qualification or periodic inspection) or 4.6.4.2 (group A
inspection), the tripping time (see 6.5.1) shall be as specified (see 3.1 and table I). All poles of triple pole RCCB's
shall trip under all "must trip" conditions.
3.8 Voltage drop. The voltage drop across the auxiliary contact terminals shall not exceed .250 volt. When tested
as specified in 4.6.5, the voltage drop across the line and load terminals of the RCCB shall not exceed the following
limits per pole:
Initial measurement
After endurance
Rating (amperes)
5
.450
.50
7.5
.360
.40
10
.347
.385
15-100
.225
.250
3.9 Response time. When tested as specified in 4.6.6, the RCCB shall open within the specified time (see 3.1).
3.10 Power requirements and response time at minimum voltage. When tested as specified in 4.6.7a, b, and c,
respectively, the RCCB shall:
a. Minimum opening voltage: Open automatically.
b. Standby current drain and actuation current: Not to exceed 10 milliamperes ac and dc standby
current. The opening and closing current shall not exceed the value specified (see 3.1).
c. Maximum operating time at minimum voltage: Open or close the main contacts within a
maximum of 50 milliseconds after the corresponding opening or closing of the I/CU.
3.11 Overload cycling. When tested as specified in 4.6.8, the RCCB shall meet the 200 percent overload
calibration requirement (see 3.7) during cycling; after cycling, the RCCB shall meet the minimum and maximum
ultimate trip requirements (see 3.7).