MIL-DTL-17587C(SH)
TABLE V. Qualification and comparison test schedule and sequence /1 - Continued.
Test
Inspection
Requirement
Verification
number
5A(3)(a)
Manual cycling and mechanical position indicator
operation
5A(3)(b)
Anti-rolling verification
5A(3)(c)
Cradle strength
5B
Rack-in (circuit breaker initially in the withdrawn position and
closed)
5B(1)
Disconnect position:
5B(1)(a)
Rack-in/rack-out position indicator operation
5B(1)(b)
Cell switch operation
Manual cycling and mechanical position indicator
operation
5B(1)(c)
Anti-rolling verification
5B(2)
Test position:
5B(2)(a)
Main contact de-energization, rack-in/rack-out
indicator operation, and withdrawal interlock mechanism
operation
5B(2)(b)
Cell switch operation
5B(2)(c)
Electrical cycling and mechanical position indicator
operation
5B(2)(d)
Manual cycling and mechanical position indicator
operation
5B(2)(e)
Anti-rolling verification
5B(3)
Connect position:
5B(3)(a)
Main contact energization and rack-in/rack-out
indicator operation
5B(3)(b)
Cell switch operation